Projects

Gotthard Road Tunnel, second bore

FEDRO - Switzerland
Strategies and contracts, Underground works
Concluso
In progress

New two-lane road tunnel parallel the existing tunnel. Length 17 km with two ventilation caverns and connecting adits to the existing escape tunnel. Excavation of tunnel by TBM and D&B. Member of the engineering Joint Venture in charge of support to the employer.

astra.admin.ch

← Projects

Neuenschwander
Consulting Engineers SA

Viale Stazione 4
CH-6500 Bellinzona

Tel. +41 91 210 47 77

Fax +41 91 210 47 78


info@neu-ce.ch